Wednesday, November 29, 2006
The Liner
The liner is in!
It actually didn't take as long to lay out as I thought.... With the help of 3 trusty helpers we were able to get it down in less than an hour.
On the far end and left side of the rink (as per the picture), I pulled the liner over the boards and stapled the liner to the outside of the frame using a small piece cardboard to add some strength.
The tarp is 60x40, while my rink is only 48x22... So we rolled up the tarp on the other two ends. I didn't fasten these sides yet - I wanted to get water into the area and still have some room to let some tarp go back inside. The last thing I wanted to happen was have the weight of the water rip the tarp off of the boards - and end up flooding my yard...
So far, so good.
I turned the tap on at about 1:15pm... we'll see how long this takes.
Oh, and as the weight of the water pushed the tarp down, I *did* have to unroll some of the unsecured tarp back into the rink...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment